Skip to content

Preliminary design and final design of road construction, topographic surveys-cadastre, insurance- marking, environmental impact, sewerage-drainage and preliminary design of technical works, vertical axis 70 “Xanthi-Echinos-Greek-Bulgarian border” segment Xanthi-S.

TypeContract signing
DescriptionOn May 15, 2013, the contract for the assignment of the project “Preliminary design and final design of road construction, topographic surveys-cadastre, insurance- marking, environmental impact, sewerage-drainage and preliminary design of technical works, vertical axis 70 “Xanthi-Echinos-Greek-Bulgarian border”” “(Reference Code 5171)” on behalf of EGNATIA ODOS S.A
The eighteen-month project, amounting to 239.998,98 Euros, concerns the elaboration of Preliminary design and final design of road construction, topographic surveys-cadastre, insurance- marking, environmental impact, sewerage-drainage and preliminary design of technical works, vertical axis 70 “Xanthi-Echinos-Greek-Bulgarian border”
ContractorPartnership of Design Offices: EVERGOS SA – GEOPODOSI AEMGE – TOMI Α.Ε.Μ.Ε.Υ – GEOAPIKONISI Α.Ε.Μ.ΓΕ – DOSIOU MARIA of MICHAEL – CH. MARAVEAS AND ASSOCIATES EE
Contracting AuthorityEGNATIA ODOS S.A